Project: Mechanical & Industrial Pipework Installation
Project Overview – Turnkey pipe and mechanical installations on the Thermal Hydrolysis Plant in aid of meeting tight Thames Water commissioning deadlines.
Site - Beckton Sewage Treatment Works
Scope
- To route the 1” air line from pipe rack into bucher press room, test and commission.
- To route 2” fe line from pipe rack into bucher press room, test and commission.
- To route 4” Polymer line from pipe rack into bucher press room.
- To route 14” filtrate line from bucher press room along racking and into a drain point across the road.
- Working at height – scaffold erected.
- Lifting plan for larger pipe sections
- Design, fabricate and installation of heavy duty canter lever brackets for filtrate line.